Current:Home > MarketsRekubit-Periodic flooding hurts Mississippi. But could mitigation there hurt downstream in Louisiana? -EverVision Finance
Rekubit-Periodic flooding hurts Mississippi. But could mitigation there hurt downstream in Louisiana?
Ethermac Exchange View
Date:2025-04-07 16:53:02
JACKSON,Rekubit Miss. (AP) — Flooding left squishy, stinky messes in hundreds of homes in Mississippi’s capital city in 2020 — a recurring problem when heavy rains push the Pearl River over its banks.
The U.S. Army Corps of Engineers says it intends to make a final recommendation by the end of this year on flood-control plans for the Pearl River Basin in the Jackson area, after decades of discussion among local, state and federal officials.
The biggest point of contention is whether to develop a new lake near Jackson. It would would be south of, and smaller than, a reservoir built outside the city more than 60 years ago.
While Jackson-area residents and business owners are pushing for flood mitigation, people are also expressing concern about the potential environmental impact in areas downstream in both Mississippi and Louisiana.
The corps is wrapping up a public comment period on a report it released in June, which included several flood-control proposals such as elevating, flood-proofing or buying out some homes in the Jackson area; development of a new lake; or the addition of levees.
During a hearing last month, Deion Thompson told corps officials he had to evacuate his northeast Jackson home because of the 2020 flooding. He said he wants to protect houses without destroying the environment.
“We’re just sitting ducks waiting for the next flood to happen,” said Thompson, who has lived in the same neighborhood for more than 20 years.
The Pearl River originates northeast of Jackson and flows about 490 miles (789 kilometers) through central and southern Mississippi and south Louisiana before draining into the Mississippi Sound, Lake Borgne and the Gulf of Mexico.
The Jackson area also experienced significant floods in 1961, 1979, 1982 and 1983, with some impact along the Pearl River downstream.
During a public hearing in Slidell, Louisiana, Gerald Morris said he has lived in Slidell since 1977 and experienced floods in 1979 and 1983. He said he has a bachelor’s degree in geological engineering, a master’s degree in geophysics and doctoral degree in earth sciences.
“If you can show that your various options that you’re looking at as far as dredging and all would reduce the amount of water coming down into the flood plain of the Pearl River, then it might be acceptable,” Morris said. “But until you can do that, then I am violently opposed to any sort of increase in the amount of water coming down from Mississippi into the Louisiana coast.”
Republican U.S. Sen. Roger Wicker is among the Mississippi officials who have pushed for federal funding to improve flood control in the Jackson area.
Four members of Louisiana’s congressional delegation sent a letter Monday to Michael Connor, assistant secretary of the Army for civil works, about how flood-control proposals for central Mississippi could impact their state.
“In Southeast Louisiana, our unique landscape, created in part by the Pearl River system, is essential to our way of life, culture, and economy,” House Majority Leader Steve Scalise, Rep. Troy Carter and Sens. Bill Cassidy and John Kennedy said in the letter.
“Before this project is allowed to move forward, we need to know that it will not decrease the water flow downriver, impact our coastal restoration efforts, or result in additional flooding in areas downriver from the proposed project,” the Louisiana officials wrote.
A governing board in central Mississippi, the Rankin-Hinds Pearl River Flood and Drainage Control District, has advocated the development of a new 1,700-acre (688-hectare) lake along the Pearl River by Jackson. This proposal is called the “One Lake” project because it is an alteration of a proposal years ago to create two new lakes.
The Corps of Engineers’ report said construction of “One Lake” would cost between $1 billion and $2.1 billion, and the expense would be too high for the amount of flood protection the lake would provide.
The engineers’ report had alternatives that would cost less, including a scaled-back proposal for a new lake that would not encompass environmentally sensitive areas.
Greg Divinity, a pastor in Jackson, said officials have been talking about improving flood-control measures since he was a junior in high school.
“Now, my grandbabies are juniors in high school,” Divinity said during the Jackson hearing as he urged the Corps of Engineers to move forward with a plan. “If we continue to kick the can down the road, my grandchildren’s grandchildren will be juniors in high school and will still be kicking this can down the road.”
veryGood! (82554)
Related
- 'Survivor' 47 finale, part one recap: 2 players were sent home. Who's left in the game?
- CD match, raise, or 9% APY! Promos heat up before Fed rate cut. Hurry to get the best rate
- I Tried This Viral Brat Summer Lip Stain x Chipotle Collab – and It’s Truly Burrito-Proof
- AP Decision Notes: What to expect in Missouri’s state primaries
- Intel's stock did something it hasn't done since 2022
- Video shows fugitive wanted since 1994 being stopped for minor bicycle violation
- Increasing wind and heat plus risk of thunderstorms expected in fight against California wildfire
- Tiffany Haddish Shares the NSFW Side Hustle She Used to Have Involving Halle Berry and Dirty Panties
- Skins Game to make return to Thanksgiving week with a modern look
- Georgia governor suspends Newton County commissioner accused of taking kickback
Ranking
- Nearly half of US teens are online ‘constantly,’ Pew report finds
- Olympic medals today: What is the count at 2024 Paris Games on Friday?
- Ground cinnamon products added to FDA health alert, now 16 with elevated levels of lead
- 'Bill & Ted' stars Keanu Reeves, Alex Winter to reunite in new Broadway play
- Friday the 13th luck? 13 past Mega Millions jackpot wins in December. See top 10 lottery prizes
- Authorities are investigating after a man died in police custody on Long Island
- US equestrian jumping team made last-minute lineup change, and won Olympic silver — again
- Simone Biles wins gold, pulls out GOAT necklace with 546 diamonds in it
Recommendation
Are Instagram, Facebook and WhatsApp down? Meta says most issues resolved after outages
2024 Olympics: Why Simone Biles Was Stressing While Competing Against Brazilian Gymnast Rebeca Andrade
Tulsa commission will study reparations for 1921 race massacre victims and descendants
Trump election subversion case returned to trial judge following Supreme Court opinion
Can Bill Belichick turn North Carolina into a winner? At 72, he's chasing one last high
Surviving the inferno: How the Maui fire reshaped one family's story
Skunks are driving a rabies spike in Minnesota, report says
Why Amazon stock was taking a dive today